Nylon Dog Leash Large Dog Training Leash Reflective Pet Long Leads Walking Rope Heavy Duty For French Bulldog Padded Handle

Nylon Dog Leash Large Dog Training Leash Reflective Pet Long Leads Walking Rope Heavy Duty For French Bulldog Padded Handle

Price: $40.99

Stock: in stock
Sku:design7502770995458mode

Please Choose:



Size


Add to Cart:

Nylon Dog Leash Large Dog Training Leash Reflective Pet Long Leads Walking Rope Heavy Duty For French Bulldog Padded Handle

Type: Leashes
Dog Leash Type: Basic Leashes
Origin: CN(Origin)
Material: Nylon
Season: All seasons
Pattern: Solid
Feature: Reflective
Feature: Padded
Type: Dog Leash
Width: 1.2cm(1/2inch )
Length: 150cm(5ft)
Feature: Reflective , Heavy Duty
Applicable Breeeds: Medium and Large Dogs
Suitable for: Climbing,Walking ,Training,Running
Handle: Padded
Colors: Black,Blue,Red